| Item |
Description |
Form Required |
OGC Contact |
Reference |
Daily Oil Allowable
(DOA) |
Each
oil well must have an approved DOA before being placed on production. |
Application
for Daily Oil Allowable
OGC
009 DOA
or
OGC
009a Proj DOA |
Ron Stefik |
Drilling
and Production Regulation Sections 73 and 74 |
| Production
Allowable Report— Crude Oil |
A
report must be submitted monthly for each oil well or group of wells
producing under a DOA. |
Production
Allowable Report—Crude Oil
OGC
032 PROD RPT |
Ron Stefik |
Drilling
and Production Regulation Sections 75, 80, 81 and 82 |
| GOR
Adjustment Factor for DOA |
A base
GOR factor of 177.3 m3/m3 is applied unless
evidence is supplied of a higher pool solution GOR. |
Letter
with PVT analysis |
Ron Stefik |
Drilling
and Production Regulation Section 73 and Schedule 2 |
| Daily
Gas Allowable
(DGA) |
Gas
wells which meet specific criteria must have an approved DGA before
being placed on production. |
Application
for Daily Gas Allowable
OGC
038 DGA |
Ron Stefik |
Drilling
and Production Regulation Sections 87 and 88 |
| Report
of Annual Gas Overproduction |
A
report must be submitted by December 16th each year for gas
wells which exceed their DGA. |
Report
of Annual Gas Overproduction
OGC
040 DGA OP |
Ron Stefik |
Drilling
and Production Regulation Section 89 |
| Waiver
of Off-Target Production Penalty (other than Discovery Wells) |
Conditional
waiver of the production penalty may be granted for an off-target well. |
Letter
with attached maps, data and supporting letters |
Ron Stefik |
Drilling
and Production Regulation
Sections 9 and 10 |
| Well
Product Type Classification |
A well
may be identified as an oil or gas well depending on producing GOR. |
Letter
with attached production plots |
Ron Stefik |
Petroleum
and Natural Gas Act Section 1 |
| Concurrent
Production |
Approval
to produce oil and gas above solution GOR simultaneously from an oil
pool. |
Application
as specified in Guideline
for Application for Approval of a Scheme for Concurrent Production (S.12.6 of British Columbia Oil andGas Handbook) |
Richard Slocomb |
Petroleum
and Natural Gas Act Section 97 |
| Commingled
Production |
Prior
approval is required to produce a well from more than one pool without
segregation. |
Application
as specified in Guideline
for Approval to Commingle Production from Two or More Zones (S.12.10 of British Columbia Oil and Gas Handbook) |
Richard Slocomb |
Drilling
and Production Regulation
Section 41 |
| Pressure
Maintenance or Improved Recovery |
Approval
for enhanced oil recovery through waterflood or gas injection. |
Application
as specified in Guideline
for Application for Approval of a Scheme for Pressure Maintenance or
Improved Recovery (S.12.1 of
the British Columbia Oil and Gas Handbook) |
Richard Slocomb |
Petroleum
and Natural Gas Act Section 100 |
| Progress
Report —Pressure Maintenance or Improved Recovery |
Annual
or semi-annual engineering report on project performance. |
Formal
engineering report with attachments |
Richard Slocomb |
Petroleum
and Natural Gas General Regulation
Section 8 |
| Good
Engineering Practice (GEP) |
Approval
of GEP area grants an operator relief of well spacing, target area and
individual well allowable restrictions. |
Application
as specified in Guideline
for Application for Approval of a Good Engineering Practice Area (S.12.7 of the British Columbia Oil and Gas Handbook) |
Richard Slocomb |
Drilling
and Production Regulation Section 101 |
| Underground
Storage of Natural Gas |
Approval
for an underground hydrocarbon storage scheme. |
Application
as specified in Guideline
for Application for a License for Underground Storage of Hydrocarbons (S.12.2 of the British Columbia Oil and Gas Handbook) |
Richard Slocomb |
Petroleum
and Natural Gas Act
Sections 126 –132 and Petroleum and Natural Gas Storage
Reservoir Regulation |
| Unitization |
Unitization
Agreements are submitted to the Petroleum Lands Branch of the Ministry
of Energy and Mines; technical details are reviewed by OGC Reservoir
Engineering. |
Application
as specified in Guideline
for Application for Approval of Unitization (S.12.8 of the British Columbia Oil and Gas Handbook) |
Richard Slocomb |
Petroleum
and Natural Gas Act Section 114
Petroleum and Natural Gas General Regulation
Section 5 Drilling and Production Regulation
Section 105 |
| Disposal
of Produced Water |
Approval
to operate a well for the deep disposal of produced water into a
formation |
Application
as specified in Guideline
for Approval to Dispose of Produced Water (S.12.4 of the British Columbia Oil and Gas Handbook) |
Richard Slocomb |
Drilling
and Production Regulation
Section 94 |
| Disposal
of Acid Gas |
Approval
to operate a well for the deep disposal of waste gas (hydrogen sulfide
and carbon dioxide) into a formation. |
Application
as specified in Guideline
for Approval of a Scheme to Dispose of Acid Gas (S.12.3 of the British Columbia Oil and Gas Handbook) |
Richard Slocomb |
Petroleum
and Natural Gas Act Section 100 |
| Disposal
of Non-Special Waste |
Approval
to operate a well for the deep disposal of upstream non-special waste
into a formation. |
Application
as specified in Guideline
for Application for Approval of a Deep Well Disposal of Non-Special
Waste
(S.12.5 of
the British Columbia Oil and Gas Handbook) |
Richard Slocomb |
Petroleum
and Natural Gas Act Section 100 |